27 September 2016
Announcement for Pre-Qualification Technical Assistance Blast Furnace

PT Krakatau Steel (Persero) Tbk. (“PTKS”) an Indonesian integrated steel company is currently under completing Blast Furnace Complex Project in the capacity of 1,200,000 metric ton per year of hot metal, which will be feed into the Electric Arc Furnace in the existing steelmaking facility. The main facilities of Blast Furnace Complex itself consist of:

No

Facilities

Spec

Capacity

 1.

Blast Furnace Plant

Furnace working Volume: 1832 m3

1,200,000 mtpy

 2.

Sinter Plant

Sintering machine area: 180 m2

1,780,000 mtpy

 3.

Coke Oven Plant

Oven Height: 6 m

Number of Ovens: 64

Chemical Recovery Plant.

555,000 mtpy

 4.

Hot Metal Treatment Plant

Treatment capacity:

2 x 120 ton

1,200,000 mtpy

 5.

Raw Material Storage

-

-

 6.

General Facilities

-

-

 

PTKS hereby invites the Consultant of Chinese Mill Operator of Blast Furnace Complex to participate in the prequalification of:

TECHNICAL ASSISTANCE FOR STARTING UP THE BLAST FURNACE COMPLEX UP TO PROVISIONAL ACCEPTANCE CERTIFICATE (PAC) PT KRAKATAU STEEL (PERSERO) Tbk.

 

Scope of Work

The main purpose of the Technical Assistance for PTKS Blast Furnace Complex is to assist and support PTKS personnel to control the smooth operation of Blast Furnace Complex in relating works and facilities. The Technical Assistance shall consist of three main group, which is Process Engineer, Operation Expert, and Maintenance Expert.

Process Engineer is an expert whose main responsibility to review and evaluate the requirement in preparing the Blast Furnace operation.

Operation Expert is an expert for commissioning whose main responsibility to make sure the PTKS’s operator to operate the facilities of Blast Furnace Complex by himself.

Maintenance Expert is an expert for commissioning whose main responsibility to make sure the operator to maintain the facilities of Blast Furnace Complex.

 

Requirement

  1. The Consultant must be a Chinese Mill Operator of Blast Furnace Complex. In order to have a Blast Furnace Complex function completely as required, it is possible to participate in agreement form with other Chinese mill operator;
  2. The Consultant must have similar experiences with the technology and capacity of PTKS’s Blast Furnace Complex;
  3. The consultant must have teaching method of transferring know-how of each stages in operation and maintenance The facilities of Blast Furnace Complex;

 

In order to participate in the Prequalification, the consultant shall make registration by submitt the following documents:

  1. Confirmation letter for Prequalification Participation;
  2. Company profile;
  3. Company Experience Listfor last 5 (five) years especially for relevant consultancy project indicated by front page of copy contract;

Kindly please attention that this prequalification process is non-legally binding to the tender process, meaning that PT Krakatau Steel have no obligation to continue this process directly to the tender process.

Those above documents have to written in English and should be submitted to PT KRAKATAU STEEL Tender Committee, by email to ppjp@krakatausteel.com or send by courier not later than October 7th , 2016. (For more information please contact Tender Committee)

THE TENDER COMMITTEE

PT KRAKATAU STEEL (PERSERO)Tbk.

Planning Building, 2nd Floor

Jln. Coil , Kawasan PTKS, Cilegon 42435, Banten, Indonesia

Telephone : 062.254-371517/371063

 

Email: ppjp@krakatausteel.com;

 Dilihat : 3345 kali